MachineryOffers

High quality Factory Price Drilling BI-CENTER MILL drilling bits

Product details
Packaging Detail:Seaworthy packing;Packing:steel box or as customer need;
Delivery Detail:30-45 days since received advanve payment;Port:Shanghai/tianjin;
Contact:Mike;WhatsApp:+0086 18561035027;
Type:BI-CENTER MILL;Payment Terms:L/C,T/T,Western Union;
Material:Steel body;Bearing: rubber seal or metal seal;
Supply Ability:50 Pieces per Week;Formation:hard formation;

BI-CENTER MILL

 

 

Product Description

 

The Watermelon Mill or String Mill is used to mill through collapsed casing and liners. This mill is tapered top and bottom to allow reaming both up and down. A connection on the bottom allows a stinger to be run below the mill to keep it centered which prevents cutting out of the casting or side-tracking. Watermelon Mills are often run piggyback with a long tapered mill as a pilot.

 

All mills with the exception of the Long tapered Mill and the Watermelon Mill are made with wear pads to protect the casting and maintain stability during milling operations.

 

Detailed description

 

 

 

The Off-Center Mill is designed so that when rotating it will cut a bigger hole than the OD of the mill and serve as an under reamer.For example, a 1 27/32"OD mill with a I"C. S. box when rotating off center will cut up to a2 I/16"hole and a 2 1/4"OD mill when rotating off center will cut up to a 2 7/8"hole. Therefore, when going through a nipple or a restriction you can’t rotate until you pass through the restriced area.

 

 

 

 

 

 

 

 

Packaging & Shipping

 

FAQ

Q: The goods are new or used, if you will make technical drawing and production plans for us?
A: All our goods are new ones, the production schedule will offer to you once geeting your purchase order.

Q: Do you have related inspection equipments?
A: Yes, our factory have all kinds of test equipments , and I could send their pictures and test documents to you.

Q: How long is your delivery time?
A generally it is 5-10 days if the goods are in stock. or it is 15-45days if the goos are not in stock, it is according to quality.

Show time

 

Contact Us

If you have any questions,please contact us!
We will do our best services for you!
Yantai Sanmon Machinery Equipments Co, Ltd
URL: http://www.cnsanmon.com, www.sanmongroup.com, www.completiontools.cn
Address: No.462 South Qingnian Road, Zhifu District, 264000, Shandong, China

 

 

 

 

 

 

 

 

 

VIEW MORE